Track laying of the line out of Mussel Pool began
on 18 January 1984. By the 18th of November track had been constructed to
within meters of the Central Station (Whiteman Village Junction)
platforms.
Construction of a low road base landing at Mussel
Pool was commenced on the 29th of November 1984 . This landing was the
first platform to be used at Mussel Pool and was opened on the 8th of December
1984 when the Bennett Brook Railway was officially opened. By 1987 the
run-around loop and long head shunt were in use. The Collie Signal / Staff Cabin
arrived on the 21st of April 1987, initially being used as the ticket office.
WALRPA's biggest acquisition for 1987 was the
WAGR Station Building at Nungarin. 40kms north of Merredin and some 280km's from
Perth. The building was left in situ at Nungarin
until 1989.
On the 1st of October 1988,WALRPA took delivery of
the Pingelly bus shelter which was re-erected on the platform at Mussel Pool. It
was later relocated to Kangaroo Flats siding in 1990.
Ex Lake
View & Star Planet 1 in original condition with LV&S hoppers,
stands at Mussel Pool platform with the recently installed Pingelly
Shelter behind. 1988 |
On the 6th of November 1988, the "Linen
Room" (previously the "Passenger Yard Foreman's Office" ) from the
west end of platforms 5 & 6 at Perth City station, Arrived at
Mussel Pool and was re-erected opposite the Collie cabin. It had been a
signal cabin in a former life and is destined to be the new Mussel Pool signal
cabin in the future.
 |
This photo by
T. Verney shows the Collie Cabin at the end of the platform with the
Pingelly Bus Shelter between a recently arrived Nungarin building. The
Linen Room is seen on the left. |
On 27th February 1989 the Nungarin Station Building was moved By WALRPA Members with assistance from the Army's 22nd
Construction Squadron to its current site at Mussel Pool
Station where restoration began and continued through 1990.
22nd
Construction Squadron Mack 6x6 lifts a wall section of Nungarin Station |
June 1990
and the building has been painted and the contract builder has commenced
work on the roof structure. |
"Big
Fowler" Road Locomotive looks on at Nungarin restoration work |
Roof / Verandah
timber work is finished as JOA tank wagon is trialled for the first time
in 1990 |
The Nungarin Station building opened for use
at Mussel Pool on the 3rd March 1991.